Summary: Request to construct and operate approximately 23,880 feet of 8-inch, steel pipeline and one regulator station at a maximum allowable operating pressure of 305 pounds per square inch, gauge within 100 feet of existing buildings or those under construction pursuant to WAC 480-93-020 in Aberdeen, Washington.