Compliance | 02/13/2024 | Monthly Power Cost Deferral for January 2024, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. |
Compliance | 01/12/2024 | Monthly Power Cost Deferral for December 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 12/15/2023 | Monthly Power Cost Deferral for November 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 11/15/2023 | Monthly Power Cost Deferral for October 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 10/13/2023 | Monthly Power Cost Deferral for September 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 09/15/2023 | Monthly Power Cost Deferral for August 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 08/15/2023 | Monthly Power Cost Deferral for July 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 07/12/2023 | Monthly Power Cost Deferral for June 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 06/15/2023 | Monthly Power Cost Deferral for May 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 03/15/2023 | Monthly Power Cost Deferral for February 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 02/15/2023 | Monthly Power Cost Deferral for January 2023, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 01/17/2023 | Monthly Power Cost Deferral for December 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. Staff reviewed this report and finds that it complies with the Commission’s final order in this docket. (via web portal) |
Report | 12/15/2022 | Monthly Power Cost Deferral for November 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. Staff reviewed this report and finds that it complies with the Commission’s final order in this docket. (via web portal) |
Report | 11/15/2022 | Monthly Power Cost Deferral for October 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. Staff reviewed this report and finds that it complies with the Commission’s final order in this docket. (via web portal) |
Report | 10/14/2022 | Monthly Power Cost Deferral for September 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. Staff reviewed this report and finds that it complies with the Commission’s final order in this docket. (via web portal) |
Report | 09/15/2022 | Monthly Power Cost Deferral for August 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) Staff reviewed this report and finds that it complies with the Commission’s final order in this docket. |
Report | 08/16/2022 | Monthly Power Cost Deferral for July 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 07/15/2022 | Monthly Power Cost Deferral for June 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 06/15/2022 | Monthly Power Cost Deferral Report, May 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 05/16/2022 | Monthly Power Cost Deferral Report, April 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 04/15/2022 | Monthly Power Cost Deferral Report, March 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 03/15/2022 | Monthly Power Cost Deferral Report, February 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 02/15/2022 | Monthly Power Cost Deferral Report, January 2022, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 01/14/2022 | Monthly Power Cost Deferral Report, December 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 12/15/2021 | Monthly Power Cost Deferral Report, November 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 11/15/2021 | Monthly Power Cost Deferral Report, October 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 10/15/2021 | Monthly Power Cost Deferral Report, September 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 09/15/2021 | Monthly Power Cost Deferral Report, August 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 08/16/2021 | Monthly Power Cost Deferral Report, July 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 07/15/2021 | Monthly Power Cost Deferral Report, June 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 06/15/2021 | Monthly Power Cost Deferral Report, May 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 05/14/2021 | Monthly Power Cost Deferral Report for April 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 04/15/2021 | Monthly Power Cost Deferral Report for March 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 03/15/2021 | Monthly Power Cost Deferral Report for February 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 02/16/2021 | Monthly Power Cost Deferral Report for January 2021, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 01/15/2021 | Monthly Power Cost Deferral Report for December 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 12/15/2020 | Monthly Power Cost Deferral Report for November 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 11/13/2020 | Monthly Power Cost Deferral Report for October 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 10/15/2020 | Monthly Power Cost Deferral Report for September 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 09/15/2020 | Monthly Power Cost Deferral Report for August 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 08/14/2020 | Monthly Power Cost Deferral Report for July 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 07/15/2020 | Monthly Power Cost Deferral Report for June 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 06/12/2020 | Monthly Power Cost Deferral Report for May 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 05/15/2020 | Monthly Power Cost Deferral Report for April 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 04/15/2020 | Monthly Power Cost Deferral Report for March 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 03/11/2020 | Monthly Power Cost Deferral Report for February 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 02/14/2020 | Monthly Power Cost Deferral Report for January 2020, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 01/15/2020 | Monthly Power Cost Deferral Report for December 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 12/12/2019 | Monthly Power Cost Deferral Report for November 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 11/12/2019 | Monthly Power Cost Deferral Report for October 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal |
Report | 10/15/2019 | Monthly Power Cost Deferral Report for September 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 09/13/2019 | Monthly Power Cost Deferral Report for August 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 08/15/2019 | Monthly Power Cost Deferral Report for July 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 07/15/2019 | Monthly Power Cost Deferral Report for June 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 06/14/2019 | Monthly Power Cost Deferral Report for May 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 05/15/2019 | Monthly Power Cost Deferral Report for April 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 04/11/2019 | Monthly Power Cost Deferral Report for March 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 03/15/2019 | Monthly Power Cost Deferral Report for February 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 02/15/2019 | Monthly Power Cost Deferral Report for January 2019, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 01/15/2019 | Monthly Power Cost Deferral Report, December 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 12/17/2018 | Monthly Power Cost Deferral Report, November 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 11/16/2018 | Monthly Power Cost Deferral Report for October 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 10/15/2018 | Redacted Monthly Power Cost Deferral Report for September 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 09/17/2018 | Monthly Power Cost Deferral Report for August 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 08/15/2018 | Monthly Power cost Deferral Report for July 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 07/16/2018 | Monthly Power cost Deferral Report for June 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 06/14/2018 | Monthly Power cost Deferral Report for May 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 05/15/2018 | Monthly Power cost Deferral Report for April 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 04/12/2018 | Monthly Power Cost Deferral Report for March 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Report | 03/15/2018 | Monthly Power Cost Deferral Report for February 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 02/15/2018 | Monthly Power Cost Deferral Report for January 2018, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 01/12/2018 | Monthly Power Cost Deferral Report for December 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) (hard copies rec'd 01/16/18) |
Compliance | 12/18/2017 | Monthly Power Cost Deferral Report for November 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 11/15/2017 | Monthly Power Cost Deferral Report for October 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 10/16/2017 | Monthly Power Cost Deferral Report for September 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 09/15/2017 | Monthly Power Cost Deferral Report for August 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Patrick Ehrbar. (via web portal) |
Compliance | 08/16/2017 | Monthly Power Cost Deferral Report for July 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal) |
Compliance | 07/13/2017 | Redacted Monthly Power Cost Deferral Report for June 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal) |
Compliance | 06/15/2017 | Monthly Power Cost Deferral Report for May 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal) |
Compliance | 05/15/2017 | Redacted Monthly Power Cost Deferral Report for April 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal) |
Compliance | 04/14/2017 | Monthly Power Cost Deferral Report for March 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal)(hard copies rec'd 04/17/17) |
Confidentiality Agreement | 04/03/2017 | Confidentiality Agreement for Jesse E. Cowell and Bradley G. Mullins, on behalf of the Industrial Customers of Northwest Utilities, from Jesse Gorsuch. (via web portal) |
Compliance | 03/15/2017 | Monthly Power Cost Deferral Report for February 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal) (hard copy rec'd 3/16/17) |
Compliance | 02/15/2017 | Monthly Power Cost Deferral Report for January 2017, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (via web portal)(hard copies rec'd 02/16/17) |
Compliance | 01/17/2017 | Monthly Power Cost Deferral Report for December 2016, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (scanned and posted) |
Compliance | 12/16/2016 | Monthly Power Cost Deferral Report for November 2016, on behalf of Avista Corporation d/b/a Avista Utilities, from Kelly Norwood. (scanned and posted) |
Compliance | 11/16/2016 | Monthly Power Cost Deferral Report for October 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 10/18/2016 | Monthly Power Cost Deferral Report for September 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 09/16/2016 | Revised Monthly Power Cost Deferral Report for July 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 09/16/2016 | Monthly Power Cost Deferral Report for August 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 08/15/2016 | Monthly Power Cost Deferral Report for July 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 06/16/2016 | 2016 Monthly Power Cost Deferral Report, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 05/16/2016 | Power Cost Deferral Report for the month of April 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 04/18/2016 | Power Cost Deferral Report for the month of March 2016, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 03/16/2016 | Power Cost Deferral Report for the month of February 2016, on behalf of Avista, from Kelly Norwood. (scanned and posted) |
Compliance | 02/16/2016 | Power Cost Deferral Report for the month of January 2016, on behalf of Avista, from Kelly Norwood. (scanned and posted) |
Compliance | 02/04/2016 | Revisions to Power Cost Deferral Report for the month of December 2015, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 01/19/2016 | Power Cost Deferral Report for the month of December 2015, on behalf of Avista Corporation, from Kelly Norwood. (scanned and posted) |
Compliance | 12/16/2015 | Avista Corporation's monthly power cost deferral report for the month of November 2015 from Kelly Norwood. (scanned and posted)
|
Compliance | 11/16/2015 | Monthly Power Cost Deferral Report for October 2015 on behalf of the Avista Corporation from Kelly Norwood. (scanned and posted) |
Compliance | 10/16/2015 | Power Cost Deferral Report for the month of September 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/16/2015 | Power Cost Deferral Report for the month of August 2015, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 08/17/2015 | Power Cost Deferral Report for the month of July 2015, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 07/16/2015 | Power Cost Deferral Report for the month of June 2015, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 06/16/2015 | Power Cost Deferral Report for the month of May 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/18/2015 | Power Cost Deferral Report for the month of April 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/16/2015 | Redacted Power Cost Deferral Report for the month of March 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Confidentiality Agreement | 04/06/2015 | Confidentiality Agreement of David Gomez from Krista Gross. (scanned & posted) |
Compliance | 03/16/2015 | Power Cost Deferral Report for the month of February 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/19/2015 | Power Cost Deferral Report for the month of January 2015, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/20/2015 | Power Cost Deferral Report for the month of December 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 12/17/2014 | Power Cost Deferral Report for the month of November 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 11/14/2014 | Public Power Cost Deferral Report for the month of October 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 10/17/2014 | Power Cost Deferral Report for the month of September 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 09/17/2014 | Power Cost Deferral Report for the month of August 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 08/18/2014 | Power Cost Deferral Report for the month of July 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 07/18/2014 | Power Cost Deferral Report for the month of June 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 06/12/2014 | Power Cost Deferral Report for the month of May 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 05/15/2014 | Power Cost Deferral Report for the month of April 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 04/16/2014 | Power Cost Deferral Report for the month of March 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 03/17/2014 | Power Cost Deferral Report for the month of February 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 02/18/2014 | Power Cost Deferral Report for the month of January 2014, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 01/17/2014 | Power Cost Deferral Report for the month of December 2013, on behalf of Avista Corporation, from Kelly Norwood. (scanned & posted) |
Compliance | 11/20/2013 | Power Cost Deferral Report for the month of October 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/14/2013 | Power Cost Deferral Report for the month of September 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/19/2013 | Power Cost Deferral Report for the month of August 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/14/2013 | Power Cost Deferral Report for the month of July 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/17/2013 | Power Cost Deferral Report for the month of June 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/17/2013 | Power Cost Deferral Report for the month of May 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/17/2013 | Power Cost Deferral Report for the month of April 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/17/2013 | Power Cost Deferral Report for the month of March 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/22/2013 | Power Cost Deferral Report for the month of February 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/15/2013 | Power Cost Deferral Report for the month of January 2013 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/16/2013 | Redacted Power Cost Deferral Report for the month of December 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/14/2012 | Power Cost Deferral Report for the month of November 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/13/2012 | Power Cost Deferral Report for the month of October 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/15/2012 | Power Cost Deferral Report for the month of September 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/17/2012 | Power Cost Deferral Report for the month of August 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/16/2012 | Power Cost Deferral Report for the month of July 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/16/2012 | Power Cost Deferral Report for the month of June 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/14/2012 | Power Cost Deferral Report for the month of May 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/14/2012 | Power Cost Deferral Report for the month of April 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/11/2012 | Power Cost Deferral Report for the month of March 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/15/2012 | Power Cost Deferral Report for the month of February 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/16/2012 | Power Cost Deferral Report for the month of January 2012 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/17/2012 | Power Cost Deferral Report for the month of December 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/15/2011 | Power Cost Deferral Report for the month of November 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/16/2011 | Power Cost Deferral Report for the month of October 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/14/2011 | Power Cost Deferral Report for the month of September 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/15/2011 | Power Cost Deferral Report for the month of August 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/15/2011 | Power Cost Deferral Report for the month of July 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/15/2011 | Power Cost Deferral Report for the month of June 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/15/2011 | Power Cost Deferral Report for the month of May 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/13/2011 | Power Cost Deferral Report for the month of April 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/14/2011 | Power Cost Deferral Report for the month of March 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/14/2011 | Power Cost Deferral Report for the month of February 2011 on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/16/2011 | January 2011 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/18/2011 | December 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/13/2010 | November 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/29/2010 | October 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/13/2010 | Redacted September 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/16/2010 | August 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/16/2010 | July 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/16/2010 | June 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/16/2010 | May 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/17/2010 | April 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/16/2010 | March 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/09/2010 | March 2010 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/15/2010 | February 2010 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/11/2010 | February 2010 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/18/2010 | January 2010 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 02/17/2010 | Redacted Monthly Power Cost Deferral Report, January 2010, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/20/2010 | Revised Monthly Power Cost Deferral Report, December 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 01/14/2010 | December 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/24/2009 | Revised Monthly Power Cost Deferral Report, November 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/10/2009 | Monthly Power Cost Deferral Report, November 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/18/2009 | Monthly Power Cost Deferral Report, October 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/16/2009 | October 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/16/2009 | Monthly Power Cost Deferral Report, September 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 10/09/2009 | September 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/16/2009 | Monthly Power Cost Deferral Report, August 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 09/10/2009 | August 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/19/2009 | Monthly Power Cost Deferral Report, July 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 08/14/2009 | July 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/16/2009 | Monthly Power Cost Deferral Report, June 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 07/16/2009 | June 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/15/2009 | Monthly Power Cost Deferral Report, May 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 06/08/2009 | May 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/18/2009 | Monthly Power Cost Deferral Report, April 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 05/11/2009 | Monthly Surcharge Revenue Report for the month of April 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 04/15/2009 | Monthly Power Cost Deferral Report, March 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 04/09/2009 | Monthly Surcharge Revenue Report for the month of March 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 03/13/2009 | Monthly Power Cost Deferral Report, February 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 03/11/2009 | February 2009 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 02/17/2009 | Monthly Surcharge Revenue Report, January 2009, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 02/17/2009 | Monthly Power Cost Deferral Report, January 2009, on behalf of Avista Corp., from Kelly Norwood. (scanned & posted) |
Compliance | 01/21/2009 | Monthly Power Cost Deferral Report, December 2008, on behalf of Avista Corp., from Kelly Norwood. (scanned & posted) |
Compliance | 01/12/2009 | December 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 12/16/2008 | Non-Confidential November 2008 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/11/2008 | November 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 11/13/2008 | Monthly Power Cost Deferral Report, October 2008, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted) |
Compliance | 11/10/2008 | Monthly Surcharge Revenue Report for the Month of October 2008, on behalf of Avista Corporation from Kelly Norwood. (scanned & posted)
|
Compliance | 10/20/2008 | September 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/20/2008 | September 2008 Monthly Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/11/2008 | Redacted August 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/11/2008 | August 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/14/2008 | July 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/14/2008 | July 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/18/2008 | June 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/18/2008 | May 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/16/2008 | May 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/12/2008 | April 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/09/2008 | April 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/14/2008 | March 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/09/2008 | March 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/13/2008 | February 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/12/2008 | February 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/14/2008 | January 2008 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/14/2008 | January 2008 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/18/2008 | December 2007 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/08/2008 | December 2007 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/17/2007 | November 2007 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/10/2007 | November 2007 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/13/2007 | October 2007 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/09/2007 | October 2007 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/08/2007 | Redacted September 2007 Monthly Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) (hard copy rec'd 10/10/2007) |
Compliance | 09/17/2007 | Redacted August 2007 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/12/2007 | August 2007 Surcharge Revenue Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/15/2007 | July 2007 Power Cost Deferral Report on behalf of Avista Corporation from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/09/2007 | July 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted)
|
Compliance | 07/16/2007 | June 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/16/2007 | June 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/11/2007 | May 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/07/2007 | May 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted)
|
Compliance | 05/14/2007 | April 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/09/2007 | April 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/13/2007 | March 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/09/2007 | March 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/12/2007 | February 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/09/2007 | February 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/15/2007 | January 2007 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/08/2007 | January 2007 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/22/2007 | Redacted December 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/10/2007 | December 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/14/2006 | Redacted November 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/11/2006 | November 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/13/2006 | October 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/06/2006 | October 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/11/2006 | September 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/09/2006 | September 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/14/2006 | Redacted version of August 2006 Monthly Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/13/2006 | August 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/17/2006 | July 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/17/2006 | July 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/19/2006 | June 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/13/2006 | June 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/14/2006 | May 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/09/2006 | May 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/11/2006 | April 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/08/2006 | April 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/13/2006 | March 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/10/2006 | March 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/13/2006 | February 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/09/2006 | February 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/16/2006 | January 2006 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/15/2006 | January 2006 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/17/2006 | December 2005 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/11/2006 | December 2005 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/12/2005 | Redacted November 2005 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/09/2005 | November 2005 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/16/2005 | October 2005 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/16/2005 | October 2005 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/17/2005 | September 2005 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/17/2005 | September 2005 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/15/2005 | August 2005 Power Cost Deferal Report on behalf of Avista Corporation, d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/12/2005 | August 2005 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/12/2005 | July 2005 Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/10/2005 | July 2005 Surcharge Revenue Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/15/2005 | June 2005 Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/14/2005 | June 2005 Surcharge Revenue Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/13/2005 | May 2005 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/10/2005 | May 2005 Surcharge Revenue Report on behalf of Avista Corporation, from Kelly Norwood (scanned & posted). |
Compliance | 05/16/2005 | April 2005 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/12/2005 | April 2005 Surcharge Revenue Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/20/2005 | Redacted March 2005 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/20/2005 | March 2005 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/14/2005 | February 2005 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/10/2005 | February 2005 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/22/2005 | January 2005 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/11/2005 | January 2005 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/18/2005 | December 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 01/10/2005 | December 2004 Surcharge Revenue Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/17/2004 | November 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/09/2004 | November 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/12/2004 | Redacted October 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 11/12/2004 | October 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/14/2004 | September 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 10/13/2004 | September 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/15/2004 | August 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 09/13/2004 | August 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/16/2004 | July 2004 Power Cost Deferral Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 08/11/2004 | July 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/15/2004 | Redacted June 2004 Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/09/2004 | June 2004 Surcharge Revenue Report on behalf of Avista Corp., d/b/a Avista Utilities. (Scanned & Posted) |
Compliance | 06/11/2004 | May 2004 Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 06/10/2004 | May 2004 Surcharge Revenue Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/19/2004 | April 2004 Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 05/10/2004 | April 2004 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/16/2004 | March 2004 Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 04/07/2004 | March 2004 Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/15/2004 | February 2004 Monthly Power Cost Deferral Report on behalf of Avista Corp. d/b/a Avista Utilities, from Kelly Norwood. (Scanned & Posted) |
Compliance | 03/08/2004 | February 2004 Monthly Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/17/2004 | January 2004 Monthly Power Cost Deferral Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 02/11/2004 | January 2004 Monthly Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. |
Compliance | 01/12/2004 | Monthly Surcharge Revenue Report for the Month of December 2003 on behalf of Avista Corp. from Kelly Norwood. (Scanned & Posted) |
Compliance | 12/10/2003 | Monthly Surcharge Revenue Report for the Month of November 2003 on behalf of Avista Corp. from Kelly Norwood. (Scanned & Posted) |
Testimony | 12/02/2003 | Supplemental Testimony of Catherine M. Elder on behalf of Public Counsel from Robert W. Cromwell, Jr. (via e-mail) (Hardcopy rec'd: 12/3/03) |
Motion | 11/24/2003 | Motion to Submit Supplemental Testimony on behalf of Public Counsel from Robert W. Cromwell, Jr.
|
Compliance | 11/07/2003 | Monthly Surcharge Revenue Report for the Month of October 2003 on behalf of Avista Corp. from Kelly Norwood. (Scanned & Posted)
|
Compliance | 10/10/2003 | September 2003 Monthly Surcharge Revenue Report on behalf of Avista Corporation, d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Motion | 10/07/2003 | Motion to Continue Hearing Dates on behalf of Public Counsel from Robert W. Cromwell, Jr.
|
Compliance | 09/11/2003 | August 2003 Monthly Surcharge Revenue Report on behalf of Avista Corporation, d/b/a Avista Utilities, from Kelly Norwood. (Scanned & Posted) |
Exhibit | 08/19/2003 | Exhibit No. 10 - 17. |
Compliance | 08/11/2003 | July 2003 Monthly Surcharge Revenue Report on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Compliance | 07/09/2003 | Monthly Surcharge Revenue Report for the Month of June 2003 on behalf of Avista Corporation d/b/a Avista Utilities from Kelly Norwood. (Scanned & Posted) |
Transcript | 06/09/2003 | Transcript; Volume 5; May 23, 2003; Pages 253 - 281 (Billing 6-13-03)
|
Order - Prehearing Conference | 05/27/2003 | Sixth Supplemental Order: Prehearing Conference Order. |
Response | 05/16/2003 | Answer to Motion for Prehearing Conference on behalf of Avista Corporation d/b/a Avista Utilities, from Don M. Falkner. |
Notice of Hearing | 05/15/2003 | Notice of Prehearing Conference (May 23, 2003, 9:30 a.m.)
|
Notice | 05/09/2003 | Notice of Opportunity to File Answer (Wednesday, May 14, 2003).
|
Motion | 05/08/2003 | Motion for Prehearing Conference on behalf of staff, the Industrial Customers of Northwest Utilities and Public Counsel from Donald Trotter, AAG.
|
Transcript | 07/22/2002 | Transcript; Public Hearing; June 10, 2002; Pages 1 - 60(Billing 10/16/02)
|
Letter | 06/27/2002 | Carole Washburn letter to all parties, RE: Compliance tariff filing is approved to become effective July 1, 2002.
|
Transcript | 06/25/2002 | Transcript; Volume 3; June 11, 2002; Pages 133 - 144 (Billing 7-8-02)
|
Notice | 06/21/2002 | Notice of Supplemental Service t the Commission's Fifth Suppemental Order (June 18, 2002). (6/21/02) |
Order - Final | 06/18/2002 | Fifth Supplemental Order: Rejecting Tariff Filing; Approving and Adopting Settlement Stipulation; Authorizing and Requiring Compliance Filing. (6/18/02)
|
Transcript | 06/14/2002 | Transcript; Volume 4; June 12, 2002; Pages 145 - 252 (Billing 7-1-02)
|
Response | 06/13/2002 | Response to Bench Request No. 25 on behalf of Staff from Jonathan C. Thompson.
|
Notice | 06/10/2002 | Notice of Issuance of Commission Bench Requests (June 12, 2002). (6/10/02) |
Document | 06/06/2002 | Prepared Statements of Kelly Norwood and Jon Eliassen regarding the all party Stipulation filed with the Commission on May 31, 2002 on behalf of Avista from Don Falkner. (FAX) (Hardcopy rec'd 6/7/02) |
Stipulation | 06/03/2002 | Attachment 1 to the Settlement Stipulation filed on May 31, 2002 on behalf of staff from Jonathan Thompson, AAG.
|
Notice of Hearing | 06/03/2002 | Notice of Public Comment Hearing on Proposed Settlement (Monday, June 10, 2002, at 6:30 p.m.); Notice of Prehearing Conference (Tuesday, June 11, 2002, at 1:30 p.m.); and Notice of Evidentiary Hearing on Proposed Settlement (Wednesday, June 12, 2002, at 9:00 a.m.). (Served on 6/3/02.) |
Memorandum | 06/03/2002 | Memorandum Explaining Settlement Stipulation on behalf of staff from Donald Trotter, AAG. |
Agreement | 05/31/2002 | Settlement Stipulation on behalf of parties from Jonathan Thompson, AAG |
Order - Final | 03/04/2002 | Fourth Supplemental Order Rejecting Tariff Filing; Approving and Adopting Settlement Stipulation Concerning Interim Rates; Authorizing and Requiring Compliance Filing. |
Letter | 03/01/2002 | Letter, RE: Settlement Stipulation on behalf of SNAP from Don Andre and on behalf of Northwest Energy Coalition from Sara Patton. (FAX)(posted) |
Transcript | 02/28/2002 | Transcript; Volume 2; 2/25/02; pages 67-132.
|
Memorandum | 02/22/2002 | Memorandum in Explanation of Settlement Stipulation on behalf of staff from Donald Trotter, AAG. (posted) |
Notice of Hearing | 02/21/2002 | Notice of Hearing on Settlement Proposal (Monday, February 25, 2002, 10:00 a.m.) |
Agreement | 02/20/2002 | Settlement Stipulation on behalf of parties from Donald Trotter, AAG. (posted) |
Letter | 01/23/2002 | Errata to Third Supplemental Order. |
Exhibit | 01/22/2002 | Revised Exhibit No. RRP-1, pages 1 and 2 for witness Ronald Peterson on behalf of Avista from Kelly Norwood. (Posted) |
Transcript | 01/11/2002 | Transcript; Volume 1; 12/21/01; pages 1-63. (Billing 2-21-02)
|
Order - Supplemental | 01/09/2002 | Third Supplemental Order: Amending Procedural Schedule |
Order - Protective | 01/03/2002 | Second Supplemental Order - Protective Order. |
Notice | 01/03/2002 | Notice of Issuance of Commission Bench Request (January 8, 2002). |
Order - Prehearing Conference | 12/28/2001 | First Supplemental Order: Prehearing Conference; UE-011514 Second Supplemental Order: Prehearing Conference
|
Exhibit | 12/27/2001 | Revised Exhibit RJL_12(Revised) of Robert Lafferty on behalf of Avista from Kelly Norwood. (posted) |
Testimony | 12/26/2001 | Corrected/Complete Direct Testimony of Kelly Norwood, William Johnson and Thomas Dukich on behalf of Avista from Mike Fink. (posted)
|
Notice of Hearing | 12/17/2001 | Notice of Prehearing Conference (December 21, 2001). |
Order - Other | 12/12/2001 | Complaint and Order Suspending Tariff Revisions
|
Testimony | 12/03/2001 | Direct Testimony of Gary Ely, Scott Morris, Jon Eliassen, Ronald Peterson, Kelly Norwood, William Avera, Robert Lafferty, William Johnson, Clint Kalich, Thomas Dukich, Bruce Folsom, Tara Knox, and Brian Hirschkorn on behalf of Avista from Kelly Norwood. (Posted)
|
Petition | 12/03/2001 | Petition for an Interim Electric Rate Increase on behalf of Avista from Kelly Norwood. |