Summary: Petition for exemption from WAC 480-93-020, Proximity Considerations. Review proposed design and location for the South Tacoma Town Border Station. The new station will replace the existing facility with a higher capacity and an increased pressure rating. Commission approval is required when the pressure exceeds 500 psig pursuant to the proximity considerations.