Document Type | Date | Description |
---|---|---|
Compliance | 01/31/2012 | December 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 02/01/2012) |
Letter | 01/26/2012 | Letter on behalf of Renewable Northwest Project from Megan Decker, RE: request to change the parties on the official service list. (via email) (hard copy rec'd 01/30/2012) |
Compliance | 12/29/2011 | November 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 12/30/2011) |
Compliance | 11/30/2011 | October 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 12/01/2011) |
Compliance | 10/28/2011 | September 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 10/31/2011) |
Compliance | 09/27/2011 | August 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 09/29/2011) |
Compliance | 08/16/2011 | July 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy from Tom DeBoer. (via web portal) (hard copy rec'd 08/19/2011) |
Compliance | 07/21/2011 | June 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) |
Compliance | 06/22/2011 | May 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 06/23/2011) |
Compliance | 05/27/2011 | April 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 05/31/2011) |
Compliance | 04/15/2011 | March 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 4/18/2011) |
Compliance | 03/29/2011 | February 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 3/31/2011) |
Compliance | 02/23/2011 | January 2011 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (Hard copy rec'd 2/24/11) |
Compliance | 01/31/2011 | December 2010 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 02/01/2011) |
Compliance | 12/17/2010 | November 2010 monthly update for the REC/PTC offset on behalf of Puget Sound Energy, Inc., from Tom DeBoer. (via Web Portal) (hard copy rec'd 12/20/2010) |
Exhibit | 12/06/2010 | Exhibits: B-1, J-1T, J-2T, J-3 - J-23, TAD-1T, TAD-2, TAD-3HCT, TAD-4HC, TAD-5HC, TAD-6HC, TAD-7C, TAD-8 - TAD-11, TAD-12HC, TAD-13 - TAD-15, TAD-16C, TAD-17 - TAD-20, TAD-21HC, TAD-22, TAD-23HC, TAD-24C, TAD-25 - TAD-29, TAD-30HC, TAD-31HC, TAD-32, MPP-1THC, MPP-2, SN-1HCT, SN-2, SN-3, SN-4HC, SN-5HC, SN-6C, SN-7 - SN-9, SN-10C, SN-11 - SN-13, SN-14HC, KCH-1T, KCH-2HC, KCH-3, DWS-1HCT, DWS-2, DWS-3HC, DWS-4HC, DWS-5HC, DWS-6 - DWS-19 |
Compliance | 10/29/2010 | Compliance Letter |
Replacement Page | 10/28/2010 | Replacement pages on behalf of Puget Sound Energy, Inc., from Tom DeBoer, RE: replaces two of the tariff sheets filed on October 27,2010. (via Web Portal) |
Compliance | 10/27/2010 | Compliance filing on behalf of Puget Sound Energy, Inc., from Tom DeBoer, RE: revisions to the WN U-60 tariff. (via Web Portal) |
Order - Final | 10/26/2010 | Order 06 - Granting Joint Petition For Approval of Joint Proposal and Request For Amendment of Order 03; Consolidating Proceedings and Granting Accounting Petition |
Response | 10/21/2010 | Response to Bench Request No. 2 on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal) (hard copy rec'd 10/22/2010)
|
Notice | 10/20/2010 | Notice of Bench Request (Due by Friday, October 22, 2010) |
Motion | 09/22/2010 | Joint Motion, Agreed Proposal, and request for Amendment of Order 03 on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal) (hard copy rec'd 09/23/2010)
|
Order - Other | 08/31/2010 | Order 05 - Denying PSE Petition for Reconsideration; Denying Energy Project Petition for Reconsideration; Granting in Part Staff Petition for Reconsdieration. |
Transcript | 08/27/2010 | Transcript Volume 3; August 17, 2010; Pages 209-335.
|
Response | 08/19/2010 | Response to Bench Request No. 1 on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal) (hard copy & disk rec'd 08/20/2010) |
Log | 08/12/2010 | Commission Staff witness list, time estimate, list of proposed exhibits and exhibits from Donald T. Trotter. |
Exhibit | 08/12/2010 | Witness List, Exhibit List and Direct Exhibits on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal) (hard copy rec'd 08/13/2010)
|
Notice of Hearing | 06/29/2010 | Notice of Hearing (Set for Tuesday, August 17, 2010, 1:30 p.m.), Notice Reopening Record, Notice Postponing Date For Entry on Petitions For Reconsideration (Rescheduled to Tuesday, August 31, 2010) |
Response | 06/15/2010 | Commission Staff's Response to The Energy Project's Petition for Reconsideration from Donald T. Trotter.
|
Response | 06/15/2010 | Commission Staff's Response to Puget Sound Energy's Petition for Reconsideration from Donald T. Trotter. |
Testimony | 06/15/2010 | Declaration of Charles Eberdt on behalf of The Energy Project from Ronald L. Roseman, RE: support of the Answer to Staff's Petition for Reconsideration. (via e-mail) |
Response | 06/15/2010 | Redacted Answer on behalf of Public Counsel from Sarah A. Shifley, RE: PSE's Petition for Reconsideration. (via e-mail) (hard copy rec'd 06/16/2010)
|
Response | 06/15/2010 | Answer on behalf of The Energy Project from Ronald L. Roseman, RE: Staff's Petition for Reconsideration. (via e-mail) (hard copy rec'd 06/16/2010) |
Response | 06/15/2010 | Answer on behalf of Puget Sound Energy, Inc., from Donna Barnett for Sheree Strom Carson, RE: Petitions for Reconsideration filed by Commission Staff and The Energy project. (via Web Portal) (hard copy rec'd 06/16/2010) |
Response | 06/15/2010 | Answer on behalf of NW Energy Coalition from David S. Johnson, RE: Petition for Reconsideration. (via e-mail) (hard copy rec'd 06/16/2010) |
Response | 06/15/2010 | Answer on behalf of the Industrial Customers of Northwest Utilities from Martin H. Patail, RE: PSE's Petition for Reconsideration. (via e-mail) (hard copy rec'd 06/16/2010) |
Notice | 06/07/2010 | Notice of Substitution to Service List on behalf of the Renewable Northwest Project from Glenn Amster. (via Web Portal) (hard copy rec'd 06/07/2010) |
Order - Other | 06/03/2010 | Order 04 - Granting Motion for Extension of Time |
Notice | 06/03/2010 | Notice Allowing Answers to Petition for Reconsideration (Tuesday, June 15, 2010 by 3:00 p.m.) |
Compliance | 06/02/2010 | Redacted compliance filing on behalf of Puget Sound Energy, Inc., from Tom DeBoer, RE: full accounting of calculation of net proceeds from sale of REC's per paragraph 93 of Order No. 03. (scanned & posted) |
Petition | 06/01/2010 | Commission Staff's Petition for Reconsideration from Donald T. Trotter. |
Motion | 06/01/2010 | Motion on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson, RE: Extension of Time. (via Web Portal) (hard copy rec'd 06/02/2010) |
Petition | 05/28/2010 | Petition for Reconsideration on behalf of The Energy Project from Ronald L. Roseman. (via e-mail) (hard copy rec'd 06/01/2010) |
Petition | 05/28/2010 | Petition for Reconsideration on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal) (hard copy rec'd 06/01/2010) |
Testimony | 05/28/2010 | Declaration of Charles Eberdt on behalf of The Energy Project from Ronald L. Roseman. (via e-mail) |
Order - Final | 05/20/2010 | Order 03 - Final Order Granting, in Part, and Denying, in Part, Amended Petition; Determining Appropriate Accounting and Use of Net Proceeds From the Sales of Renewable Energy Credits and Carbon Financial Instruments |
Brief | 04/14/2010 | Staff Corrected Posthearing Brief (p. 23) from Donald T. Trotter. |
Document | 03/25/2010 | Notice of substitution to service list on behalf of the Renewable Northwest Project from Glenn Amster. (via Web Portal) (hard copy rec'd 03/26/2010) |
Document | 03/18/2010 | Signature page on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson, RE: signature inadvertently omitted from Brief filed on 3/17/2010. (via Web Portal) (hard copy rec'd 03/19/2010) (signature page will be housed in Brief file) |
Brief | 03/18/2010 | Redacted Brief on behalf of the Industrial Customers of Northwest Utilities from Brendan E. Levenick. (via e-mail) (hard copy rec'd 03/19/2010) |
Brief | 03/17/2010 | Redacted Brief on behalf of Puget Sound Energy from Sheree Strom Carson. (via web portal) (hard copy rec'd 03/18/2010) |
Brief | 03/17/2010 | Redacted Brief on behalf of Public Counsel from Sarah A. Shifley. (via e-mail) (hard copy rec'd 03/18/2010)
|
Brief | 03/17/2010 | Redacted Brief on Behalf of Commission Staff from Donald T. Trotter. |
Brief | 03/17/2010 | Initial Brief on behalf of The Kroger Co., from Kurt J. Boehm. (via e-mail) (hard copy rec'd 03/18/2010) |
Exhibit | 03/09/2010 | Redacted Errata Sheet Exhibit No. (SN-1T) on behalf of Public Counsel from Sarah Shifley. (via e-mail) (hard copy rec'd 03/10/2010)
|
Transcript | 03/08/2010 | Transcript Volume 2 Redacted; March 5, 2010; Pages 35-208. |
Exhibit | 03/04/2010 | Redacted Supplemental Cross Examination Exhibits on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 03/05/2010) |
Exhibit | 03/04/2010 | Redacted additional proposed Cross Examination Exhibits on behalf of Public Counsel from Sarah Shifley. (via e-mail) (hard copy rec'd 03/05/2010) |
Log | 03/03/2010 | Staff Cross Examination Exhibit List and Witness Order on behalf of Staff from Donald T. Trotter.
|
Exhibit | 03/03/2010 | Redacted Proposed Cross Examination Exhibits on behalf of Public Counsel from Sarah Shifley. (via e-mail) (hard copy rec'd 03/03/2010)
|
Exhibit | 03/03/2010 | Exhibit on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson, RE: Exhibit No. TAD-9 that was inadvertently omitted from the February 18, 2010 filing. (via Web Portal) |
Exhibit | 03/03/2010 | Cross Examination Exhibits on behalf of the Industrial Customers of Northwest Utilities from Brendan E. Levenick. (via e-mail) (hard copy rec'd 03/03/2010)
|
Exhibit | 03/03/2010 | Cross Examination Exhibit of Mike Parvinen on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via Web Portal)
|
Testimony | 02/19/2010 | Redacted Prefiled Rebuttal Testimony and Exhibits and Joint Prefiled Testimony of Tom DeBoer on behalf of Puget Sound Energy, Inc, from Sheree Strom Carson. (via Web Portal) (hard copy rec'd 02/19/2010)
|
Testimony | 02/10/2010 | Revised Redacted Testimony and Exhibits of Donald W. Schoenbeck on behalf of the Inddustrial Customers of Northwest Utilities (ICNU) from Brendan E. Levenick. (via e-mail) (hard copy rec'd 02/11/2010) |
Confidentiality Agreement | 02/08/2010 | Highly Confidential Agreements of Chuck Eberdt on behalf of The Energy Project from Ronald L. Roseman. (scanned & posted) |
Confidentiality Agreement | 01/29/2010 | Highly Confidential Agreements of Kurt Boehm, Neal Townsend, Kevin Higgins, and Olivia Smith on behalf of The Kroger Co., on behalf of its Fred Meyer Stores and Quality Food Centers from Kurt J. Boehm. (via e-mail) (hard copy rec'd 02/01/2010) |
Confidentiality Agreement | 01/29/2010 | Confidentiality Agreements of Kurt Boehm, Neal Townsend, Kevin Higgins, and Olivia Smith on behalf of The Kroger Co., on behalf of its Fred Meyer Stores and Quality Food Centers from Kurt J. Boehm. (via e-mail) (hard copy rec'd 02/01/2010) |
Testimony | 01/28/2010 | Redacted Testimony of Michael P. Parvinen on behalf of Commission Staff from Donald T. Trotter. |
Testimony | 01/28/2010 | Redacted Response Testimony of Donald W. Schoenbeck on behalf of the Industrial Customers of Northwest Utilities from Allison Wils. (via e-mail) (hard copy rec'd 01/29/2010) |
Testimony | 01/28/2010 | Redacted Response Testimony and Exhibits of Scott Norwood on behalf of Public Counsel from Sarah A. Shifley. (via e-mail) (hard copy rec'd 01/29/2010)
|
Testimony | 01/28/2010 | Redacted Prefiled Response Testimony and Exhibits of Kevin C. Higgins on behalf of The Kroger Co., on behalf of its Fred Meyer Stores and Quality Food Centers from Kurt J. Boehm. (via e-mail) (hard copy rec'd 01/29/2010) |
Confidentiality Agreement | 01/27/2010 | Confidentiality Agreement of S. Bradley Van Cleve on behalf of Industrial Customers of Northwest Utilities (ICNU) from Allison M. Wils. (via e-mail) (hard copy rec'd 01/28/2010) |
Confidentiality Agreement | 01/26/2010 | Highly Confidential Agreement of Jesse Cowell on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 1/27/2010) |
Confidentiality Agreement | 01/26/2010 | Highly Confidential Agreement of Irion Sanger on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 1/27/2010) |
Confidentiality Agreement | 01/26/2010 | Confidentiality Agreement of Jesse Cowell on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 1/27/2010) |
Confidentiality Agreement | 01/26/2010 | Confidentiality Agreement of Irion Sanger on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 1/27/2010) |
Notice | 01/25/2010 | Notice of Appearance on Behalf of Commission Staff from Donald T. Trotter. |
Confidentiality Agreement | 01/25/2010 | Highly Confidential Agreement signed by Donald T. Trotter on behalf of Staff from Donald T. Trotter. |
Confidentiality Agreement | 01/25/2010 | Confidentiality Agreement signed by Donald T. Trotter on behalf of Staff from Donald T. Trotter. |
Confidentiality Agreement | 01/15/2010 | Confidentiality Agreements of David S. Johnson and Danielle Dixon on behalf of NW Energy Coalition from Danielle Dixon. (via e-mail) (hard copy rec'd 01/19/2010) |
Confidentiality Agreement | 01/08/2010 | Highly Confidential Agreements of Danielle Dixon and David S. Johnson on behalf of NW Energy Coalition from Danielle Dixon. (via e-mail) (hard copy rec'd 01/11/2010) |
Confidentiality Agreement | 12/28/2009 | Highly Confidential agreement signed by Anne Solwick from Robert D. Cedarbaum. |
Confidentiality Agreement | 12/28/2009 | Confidentiality agreement signed by Anne Solwick from Robert D. Cedarbaum. |
Notice | 12/22/2009 | Notice of Appearance on behalf of The Energy Project from Ronald L. Roseman. (scanned & posted) |
Confidentiality Agreement | 12/22/2009 | Highly Confidential Agreement on behalf of the Industrial Customers of Northwest Utilities from Brendan E. Levenick. (via e-mail) (hard copy rec'd 12/23/2009) |
Confidentiality Agreement | 12/22/2009 | Highly Confidential Agreement of Ronald L. Roseman on behalf of The Energy Project from Ronald L. Roseman. (scanned & posted) |
Confidentiality Agreement | 12/22/2009 | Confidentiality Agreements of Ronald L. Roseman, Charles Eberdt, and Michael Karp on behalf of The Energy Project from Ronald L. Roseman. (scanned & posted) |
Confidentiality Agreement | 12/21/2009 | Highly Confidential Agreement of Scott Norwood on behalf of Public Counsel from Sarah A. Shifley. (via e-mail) (hard copy rec'd 12/22/2009) |
Confidentiality Agreement | 12/21/2009 | Confidentiality Agreements of Simon J. ffitch, Sarah Shifley, Mary Kimball, Stefanie Johnson, Lea Daeschel, Carol Williams, Mary Harper, Linda J. Borla, Aimee Coe, and Scott Norwood on behalf of Public Counsel from Sarah A. Shifley. (via e-mail) (hard copy rec'd 12/22/2009) |
Confidentiality Agreement | 12/17/2009 | Highly Confidential agreements signed by Robert D. Cedarbaum, Michael Parvinen, Thomas Schooley, Kathryn Breda, Roland Martin, and Joanna Huang on behalf of Staff from Robert D. Cedarbaum. |
Confidentiality Agreement | 12/17/2009 | Confidentiality agreements signed by Robert D. Cedarbaum, Michael Parvinen, Thomas Schooley, Kathryn Breda, Roland Martin, and Joanna Huang on behalf of Staff from Robert D. Cedarbaum. |
Transcript | 12/15/2009 | Transcript Volume 1; December 1, 2009; Pages 1-34.
|
Order - Protective | 12/14/2009 | Order 02 - Protective Order With "Highly Confidential" Provisions |
Order - Prehearing Conference | 12/04/2009 | Order 01 - Prehearing Conference Order
|
Petition | 11/25/2009 | Petition to Intervene on behalf of the Renewable Northwest Project from Glenn J. Amster. (via Web Portal) (hard copy rec'd 11/25/2009) |
Notice | 11/25/2009 | Notice of Appearance on behalf of the Renewable Northwest Project from Glenn J. Amster. (via Web Portal) (hard copy rec'd 11/25/2009) |
Petition | 11/20/2009 | Petition to Intervene on behalf of Northwest Energy Coalition from Danielle Dixon. (via e-mail) (hard copy rec'd 11/23/2009) |
Notice | 11/20/2009 | Notice of Appearance of David S. Johnson and Danielle Dixon on behalf of Northwest Energy Coalition from Danielle Dixon. (via e-mail) (hard copy rec'd 11/23/2009) |
Notice of Hearing | 11/06/2009 | Notice of Prehearing Conference (Set for December 1, 2009, at 1:30 p.m.)
|
Petition | 10/28/2009 | Petition to Intervene of The Kroger Co., on behalf of its Fred Meyer Stores and Quality Food Centers from Kurt J. Boehm. (via e-mail) |
Letter | 10/28/2009 | Errata to the Petition to Intervene of The Kroger Co., on behalf of its Fred Meyer Stores and Quality Food Centers from Kurt J. Boehm. (via e-mail) (hard copy rec'd 10/29/2009) |
Petition | 10/22/2009 | Petition to Intervene on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 10/23/2009) |
Notice | 10/22/2009 | Notice of Appearance of S. Bradley Van Cleve and Irion Sanger on behalf of Industrial Customers of Northwest Utilities from Brenden E. Levenick. (via e-mail) (hard copy rec'd 10/23/2009) |
Notice | 10/08/2009 | Notice of Appearance on behalf of Public Counsel from Sarah A. Shifley. (via e-mail) (hard copy rec'd 10/09/2009) |
Document | 10/07/2009 | Amended Petition for an Order Authorizing the Use of the Proceesa from the Sale of Renewable Energy Credits and Carbon Financial Instruments on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson. (via e-mail) (hard copy rec'd 10/8/2009) |
Exhibit | 10/07/2009 | Amended Testimony and Exhibits on behalf of Puget Sound Energy, Inc., from Sheree Strom Carson, RE: Joint Testimony of Tom DeBoer in Support of Amended Petition, Joint Testimony and Professional Qualifications of Eric E. Englert, Sandra M. Sieg, Danielle O. Dixon, Ann E. Gravatt, and Charles M. Eberdt. (via e-mail) (hard copy rec'd 10/8/2009)
|
Initial Filing | 04/16/2007 | Initial filing on behalf of Puget Sound Energy from Karl R. Karzmar. |