Document Type | Date | Description |
---|---|---|
Letter | 01/26/2010 | Letter to Eldon N. Book, Cascade Natural Gas Corporation from David Lykken, RE: Area of concern. (scanned & posted) |
Letter | 11/10/2009 | Letter of Concern (LOC) from Chris Hoidal of PHMSA to Eldon N. Book, Cascade Natural Gas, RE: Result of Inspection of the Kelso Beaver Pipeline natural gas facilities. (scanned & posted) |
Memorandum | 11/05/2009 | Post Inspection Memo (PIM) approved by PHMSA on 11/5/09. (scanned & posted) |
Memorandum | 07/09/2009 | Post Inspection Memo submitted to PHMSA on 7/9/09 for the Finger Drains Installation Inspection (via e-mail) (scanned & posted) |
Memorandum | 07/06/2009 | Post Inspection Memo for the PBV valve defective bolts replacements - approved by PHMSA. (scanned & posted) |
Report | 06/03/2009 | Post Inspection Memo (PIM) submitted to PHMSA on 6/3/09 for the PBV Valve defective bolts replacement. (scanned & posted) |
Report | 04/08/2009 | Inspection documents submitted to PHMSA on 4/8/09 for peer review. (scanned & posted)
|