Filter by document type: All | Letter | Memorandum | Report
Document Type Date Description
Letter 01/05/2011 Letter from Chris Hoidal, PHMSA to Ken Leier, Trans Canada, RE: Inspection conducted by UTC Staff from 08/24/2009 - 08/27/2009 and 09/08/2009 - 09/11/2009. (scanned & posted)
Letter 01/04/2011 Letter from Ken Leier, Trans Canada Pipelines Limited GTN System to Chris Hoidal, PHMSA, Responding to PHMSA Letter dated 09/21/2010. (scanned & posted)
Memorandum 11/01/2010 Post Inspection Memorandum and gas IMP verification inspection form approved by PHMSA on 10/19/2010. (scanned & posted)
Memorandum 04/15/2010 Post Inspection Memorandum. (scanned & posted)
Report 10/05/2009 Inspection documents submitted to PHMSA via e-mail on 10/05/2009. (scanned & posted)