Document Type | Date | Description |
---|---|---|
Letter | 01/05/2011 | Letter from Chris Hoidal, PHMSA to Ken Leier, Trans Canada, RE: Inspection conducted by UTC Staff from 08/24/2009 - 08/27/2009 and 09/08/2009 - 09/11/2009. (scanned & posted) |
Letter | 01/04/2011 | Letter from Ken Leier, Trans Canada Pipelines Limited GTN System to Chris Hoidal, PHMSA, Responding to PHMSA Letter dated 09/21/2010. (scanned & posted) |
Memorandum | 11/01/2010 | Post Inspection Memorandum and gas IMP verification inspection form approved by PHMSA on 10/19/2010. (scanned & posted) |
Memorandum | 04/15/2010 | Post Inspection Memorandum. (scanned & posted) |
Report | 10/05/2009 | Inspection documents submitted to PHMSA via e-mail on 10/05/2009. (scanned & posted)
|