UTC Case Docket Document Sets

Letter

Filing PG - 101403

 

Filter by document type: All | Email | Form | Letter
Document Type Date Description
Letter 04/25/2011 Letter from David Lykken to Jay Higgins, Knotty Pines Apartments, RE: Staff inspection on 08/17/2011 to verify the master meter system has been eliminated. (scanned & posted)
Letter 12/08/2010 Letter from David Lykken to Jay Higgins, RE: Closure letter. (scanned & posted)
Letter 10/20/2010 Letter from David Lykken to Jay Higgins Re: 2010 Natural Gas Master Meter Inspection. (Note: Letter Dated 10/08/2010 Came Back in the Mail. Resent Letter today with the Correct Street Address.)(scanned & posted)
Letter 10/08/2010 Letter from David Lykken to Jay Higgins, RE: 2010 Natural Gas Standard Inspection Knotty Pine Apartments. (scanned & posted)
Letter 06/14/2010 Letter from David Lykken to Manager, Knotty Pine Apartments, RE: Scheduling the 2010 Master Meter Inspection. (scanned & posted)
Letter 06/14/2010 Letter from David Lykken to Jody Morehouse, Avista Corporation, RE: 2010 Master Meter Inspection. (scanned & posted)