Summary: Requests permission to install and operate a new gas pipeline and pressure regulating station (R-166) at a maximum allowable operating pressure (MAOP) of 380 psig within 100' of an existing building intended for human occupancy.
Letter from David Lykken to Tina R. Beach, Cascade Natural Gas Corporation, RE: Cascade Natural Gas Corporation Request Letter Dated 09/28/2010. (scanned & posted)