Document Type | Date | Description |
---|---|---|
Report | 01/09/2013 | Follow up Post Inspection Memorandum (PIM) and checklist approved by Chris Hoidal, PHMSA on 12/18/2012. |
Report | 06/11/2012 | Post Inspection Memo (PIM) and Inspection Checklists approved by Chris Hoidal, PHMSA on 04/22/2012. (scanned & posted) |
Letter | 05/21/2012 | Letter from Chris Hoidal, PHMSA to Ken Leier, TransCanada Transmission Northwest Corporation, RE: Results of Inspection. (scanned & posted) |
Document | 04/09/2012 | Follow up inspection documentation submitted to PHMSA via e-mail on 04/09/2012. (scanned & posted) |
Report | 12/30/2011 | Inspection Documentation submitted to PHMSA via email on 12/30/2011. (scanned & posted)
|