UTC Case Docket Document Sets

Filing PG - 110390

 

Filter by document type: All | Document | Letter | Report
Document Type Date Description
Report 01/09/2013 Follow up Post Inspection Memorandum (PIM) and checklist approved by Chris Hoidal, PHMSA on 12/18/2012.
Report 06/11/2012 Post Inspection Memo (PIM) and Inspection Checklists approved by Chris Hoidal, PHMSA on 04/22/2012. (scanned & posted)
Letter 05/21/2012 Letter from Chris Hoidal, PHMSA to Ken Leier, TransCanada Transmission Northwest Corporation, RE: Results of Inspection. (scanned & posted)
Document 04/09/2012 Follow up inspection documentation submitted to PHMSA via e-mail on 04/09/2012. (scanned & posted)
Report 12/30/2011 Inspection Documentation submitted to PHMSA via email on 12/30/2011. (scanned & posted)