Document Type | Date | Description |
---|---|---|
Letter | 04/20/2012 | Letter from Kevin Raschkow, Cascade Natural Gas Corporation to David Lykken, RE: Pressure Test Notification. (rec'd via e-mail on 04/19/2012) (hard copy rec'd 04/20/2012) (scanned & posted) |
Letter | 01/11/2012 | Letter from Kevin Raschkow, Cascade Natural Gas Corporation to David Lykken, RE: Cancelling the previously submitted proximity request. Cascade Natural Gas Corporation is planning on hydrotesting the 16" instead of replacing the existing pipe. (scanned & posted) |