Summary: Request for commission approval to operate a proposed new four inch pipeline and a proposed new regulator station, Sunnyside Gate Station, at a Maximum Allowable Operating Pressure (MAOP) of 850 psig within 500 feet of existing structures intended for human occupancy, pursuant to WAC 480-93-020.
Closure letter to Eric Martuscelli of Cascade Natural Gas Corporation, dated 12/18/17, RE: Compliance items have been met for the Sunnyside Gate Station.