Summary: Request for commission approval to operate a proposed new 12” Bonney Lake pipeline at a Maximum Allowable Operating Pressure (MAOP)
of 500 psig, within 500 feet of existing structures intended for human occupancy, pursuant to WAC 480-93-020.