UTC Case Docket Details

Docket Number 190654

Case Docket Details Table
Docket Number PG-190654
Advice
Company Cascade Natural Gas Corporation
DBA
Filing Type Proximity Request
Industry (Code) Gas Pipeline (015)
Status Closed
Lead Staff Cullom, David (UTC)
Filed Date 07/31/2019
Effective Date N/A
Summary Pursuant to the requirements of WAC 480-93-020 Proximity Considerations and 49 CFR Part 192 Sub Part K Uprating, Cascade Natural Gas Corporation (Cascade) requests to increase the pressure from 250 psig to 500 psig on the existing Southridge high-pressure pipeline within 100 feet of existing buildings or those that are under construction. Cascade is performing this work due to a necessary increase in capacity to residential customers in Richland and the addition of a new industrial customer.

Event History

  • 12/05/2019 -- Approved (Commissioner Rendahl moved to Issue an order granting Cascade Natural Gas Corporation’s (Cascade or company) request to increase the pressure from 250 pounds per square inch, gauge (psig) to 500 psig on the existing Southridge high-pressure pipeline which is within 100 feet of existing buildings or those that are under construction. Cascade is performing this work due to a necessary increase in capacity to residential customers in Richland and the addition of a new industrial customer. Commissioner Balasbas seconded the motion. The motion carried (3:0))
  • 12/05/2019 --
  • 12/05/2019 -- Open Meeting
  • 08/07/2019 -- Pending
  • 08/07/2019 -- Open