Document Type | Date | Description |
---|---|---|
Other Order | 03/20/2020 | Order 01, Granting Petition to Reconstruct a Public Highway-Rail Grade Crossing and Install and Intertie Between a Highway Signal and a Railroad Crossing Signal System at State Route 524 Near Maltby (USDOT: 091814T)
|
Document | 03/12/2020 | Corrected traffic signal preemption worksheet from WSDOT. |
MASTER SERVICE LIST | 03/03/2020 | MASTER SERVICE LIST |
Initial Filing | 03/03/2020 | Petition by Washington State Department of Transportation to reconstruct a railroad crossing and install an intertie between a highway signal and railroad crossing signal system at SR-524 near Maltby, on behalf of the Washington State Department of Transportation, from Connie Raezer. (via email) |