Summary: Revises Tariff WN U-60, Schedule 26 (Large Demand General Service) and Schedule 31 (Primary General Service), clarifying that up to 15 Points of Delivery are allowed to be summed when determining a Conjunctive Maximum Demand Charge under the Conjunctive Demand Service Option if the electric load of all these Points of Delivery is dedicated to electrified transportation.