Document Type | Date | Description |
---|---|---|
Order - Open Meeting Final | 09/30/2021 | Order 10, Granting Joint Petition; Approving Amended Substitute Second Settlement Agreement.
|
Open Meeting Memo | 09/30/2021 | Open Meeting Memo for the September 30, 2021 Open Meeting.
|
Letter | 09/09/2021 | Letter to Sean Mayo from Danielle Troupe, Puget Sound Energy RE: Wrapped Steel Services Assessment Program. |
Petition | 08/17/2021 | Joint Petition to Approve Amended Substitute Second Settlement Agreement, on behalf of Puget Sound Energy and the City of Bellevue, from Donna Barnett. (via web portal)
|
Letter | 03/31/2021 | Letter to Sean Mayo from Danielle Troupe, Puget Sound Energy RE: Wrapped Steel Services Assessment Program. |
Letter | 03/31/2021 | Letter to Cheryl Zakrzewski, City of Bellevue, from Danielle Troupe, Puget Sound Energy RE: Wrapped Steel Services Assessment Program Risk Model Results for Bellevue. |
Letter | 09/14/2020 | Letter to Sean Mayo from Vidushi Raina, Puget Sound Energy RE: Wrapped Steel Services Assessment Program Risk Model Results. |
Letter | 09/14/2020 | Letter to Cheryl Zakrzewski, City of Bellevue, from Vidushi Raina, Puget Sound Energy RE: Wrapped Steel Services Assessment Program Risk Model Results for Bellevue. |
Letter | 03/31/2020 | Letter to Sean Mayo from Vidushi Raina, Puget Sound Energy RE: Wrapped Steel Services Assessment Program Annual Status Report. |
Letter | 03/31/2020 | Letter to Cheryl Zakrzewski, City of Bellevue, from Vidushi Raina, Puget Sound Energy RE: Wrapped Steel Services Assessment Program Annual Status Report for Bellevue. |
Letter | 09/13/2019 | Letter to Sean Mayo from Lee Maxwell, Puget Sound Energy RE: 2019 Wrapped Steel Services Assessment Program Annual Status Report. |
Letter | 09/13/2019 | Letter to Cheryl Zakrzewski, City of Bellevue, from Lee Maxwell, Puget Sound Energy RE: 2019 Wrapped Steel Services Assessment Program Annual Status Report for Bellevue. |
Letter | 04/03/2019 | Letter to Sean Mayo from Lee Maxwell, Puget Sound Energy RE: 2018 Wrapped Steel Services Assessment Program Annual Status Report |
Letter | 04/03/2019 | Letter to Cheryl Zakrzewski, City of Bellevue, from Lee Maxwell, Puget Sound Energy RE: 2018 Wrapped Steel Services Assessment Program Annual Status Report for Bellevue |
Letter | 09/13/2018 | Letter to Sean Mayo from Lee Maxwell, Puget Sound Energy RE: WSSAP Program 2018 Risk Model Results. |
Letter | 09/13/2018 | Letter to Cheryl Zakrzewski, City of Bellevue, from Lee Maxwell, Puget Sound Energy RE: WSSAP Program 2018 Risk Model Results. |
Letter | 03/29/2018 | Letter to Sean Mayo from Lee Maxwell, Puget Sound Energy RE: WSSAP Annual Report for Bellevue. |
Letter | 03/29/2018 | Letter Cheryl Zakrzewski of City of Bellevue, from Lee Maxwell on behalf of Puget Sound Energy RE: WSSAP Annual Status Report for Bellevue. |
Letter | 09/18/2017 | Letter to Sean Mayo from Lee Maxwell, Puget Sound Energy RE: WSSAP Program 2017 Risk Model Results. |
Letter | 03/30/2017 | Letter to Cheryl Zakrzewski of City of Bellevue, from Stephanie Silva on behalf of PSE, RE Wrapped Steel Services Assessment Program Annual Status Report for Bellevue. |
Letter | 03/30/2017 | Letter to Alan Rathbun from Stephanie Silva, Puget Sound Energy RE: WSSAP Program Annual Status Report for Bellevue. |
Letter | 09/14/2016 | Letter to Cheryl Zakrzewski, City of Bellevue from Stephanie Silva, Puget Sound Energy RE: WSSAP Program 2016 Risk Model Results. |
Letter | 09/14/2016 | Letter to Alan Rathbun from Stephanie Silva, Puget Sound Energy RE: WSSAP Program Results of the 2016 Risk Model Run. |
Letter | 04/04/2016 | Letter from Cheryl McGrath, PSE, to Alan Rathbun, RE: Wrapped Steel Assessment Program Annual Status Report for Bellevue. |
Letter | 04/04/2016 | Letter to Cheryl Zakrewski, City of Bellevue, from Cheryl McGrath, PSE, RE: Wrapped Steel Services Assessment Program Annual Status Report for Bellevue. |
Letter | 10/05/2015 | Letter to Alan Rathbun from Stephanie Silva, Puget Sound Energy RE: WSSAP Program Revised Results of the 2015 Risk Model Run. |
Letter | 09/16/2015 | Letter to Cheryl Zakrzewski, City of Bellevue from Stephanie Silva, Puget Sound Energy RE: WSSAP Program 2015 Risk Model Results. |
Letter | 09/15/2015 | Letter to Alan Rathbun from Stephanie Silva, Puget Sound Energy RE: WSSAP Program 2015 Risk Model Results. |
Letter | 03/31/2015 | Letter from Stephanie Silva, PSE, to Cheryl Zakrzewski, RE: Wrapped Steel Assessment Program Annual Status Report for Bellevue. (scanned & posted) |
Letter | 03/31/2015 | Letter from Stephanie Silva, PSE, to David Lykken RE: Wrapped Steel Services Assessment Program Annual Status. (scanned & posted) |
Letter | 09/15/2014 | Letter from Stephanie Silva, PSE, to David Lykken RE: 2014 WSSAP 2014 Risk Model Results. (scanned & posted) |
Letter | 09/15/2014 | Letter from Stephanie Silva, PSE, to Cheryl Zakrzewski, City of Bellevue RE: WSSAP 2014 Risk Model Results. (scanned & posted) |
Letter | 04/01/2014 | Letter to David Lykken from Cheryl McGrath, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program as of December 31, 2013. (scanned & posted) |
Letter | 04/01/2014 | Letter to Cheryl Zakrzewski, City of Bellevue, from Cheryl McGrath, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program as of December 31, 2013. (scanned & posted) |
Letter | 09/17/2013 | Letter to David Lykken from Cheryl McGrath, Puget Sound Energy, RE: 2013 WSSAP Risk Model Results. (scanned & posted) |
Letter | 04/01/2013 | Email from Antoinette Imad, Puget Sound Energy, to David Lykken, RE: Annual Report for the WSSAP Program as of 12/31/12. (scanned & posted)
|
Letter | 09/14/2012 | Letter to David Lykken from Cheryl McGrath, Puget Sound Energy, RE: WSSAP 2012 Risk Model Results. (scanned & posted) |
Letter | 09/14/2012 | Letter to Cheryl Zakrzewski, City of Bellevue from Cheryl McGrath, Puget Sound Energy, RE: WSSAP Program Results of the 2012 Risk Model Run. (scanned & posted) |
03/30/2012 | E-mail from Darryl Hong, Puget Sound Energy to David Lykken, RE: Annual Report for the WSSAP Program as of 12/13/2011 (Second Settlement Agreement.) (scanned & posted) | |
Letter | 09/14/2011 | Letter from Cheryl McGrath, Puget Sound Energy to David Lykken, RE: WSSAP 2011 Risk Model Results. (scanned & posted) |
03/29/2011 | E-mail from Darryl Hong, Puget Sound Energy to David Lykken, RE: Annual Status Report for the WSSAP Program as of December 31, 2010. (scanned & posted) | |
Letter | 09/15/2010 | Letter to David Lykken from Helge Ferchert, Puget Sound Energy, RE: WSSAP 2010 Risk Model Results. (scanned & posted) |
Letter | 09/15/2010 | Letter to Cheryl Zakrzewski, City of Bellevue from Helge Ferchert, Puget Sound Energy, RE: WSSAP Program, Results of the 2010 Risk Model Run. (scanned & posted) |
Letter | 03/26/2010 | Letter to Cheryl Zakrzewski, City of Bellevue, from Helge Ferchert, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program as of 12/31/2009. (scanned & posted) |
Letter | 03/19/2010 | Letter from Helge Ferchert, Puget Sound Energy to David Lykken, RE: Annual Status Report for the WSSAP Program as of 12/31/09. (scanned & posted)
|
Letter | 09/15/2009 | Letter to Cheryl A. Zakizewski, City of Bellevue from Helge Ferchert, Puget Sound Energy, RE: WSSAP 2009 Risk Model Results. (scanned & posted) |
Letter | 09/15/2009 | Letter to Anne Soiza from Helge Ferchert, Puget Sound Energy, RE: WSSAP 2009 Risk Model Results. (scanned & posted) |
Letter | 04/30/2009 | Letter to Cheryl A. Zakrzewski, City of Bellevue from Helge Ferchert, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program as of 12/31/08. (scanned & posted) |
Letter | 04/03/2009 | Letter to Anne Soiza from Helge Ferchert, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program. (scanned & posted)
|
Letter | 10/02/2008 | Letter to Dave Danner from Helge Ferchert, Puget Sound Energy, RE: WSSAP 2008 Risk Model Results. (scanned & posted) |
Letter | 06/06/2008 | Letter to Anne Soiza from Duane Henderson, Puget Sound Energy, RE: WSSAP Electrical Survey Update. (scanned & posted) |
Letter | 05/06/2008 | Letter to Cheryl A. Zakrzewski, City of Bellevue, from Duane A. Henderson, Puget Sound Energe, RE: Annual Status Report for the WSSAP Program as of 12/31/07. (scanned & posted) |
Letter | 04/16/2008 | Letter to Dave Lykken from Duane Henderson, Puget Sound Energy, RE: Annual Status Report for the WSSAP Program as of December 31, 2007. (scanned & posted)
|
Letter | 02/08/2008 | Letter to Kuang Chu from Duane Henderson, Puget Sound Energy, RE: STatus Report of Wrapped Steel Services Assessment Program. (scanned & posted)
|
Letter | 10/01/2007 | Letter to Cheryl A. Zakrzewski, City of Bellevue, from Stephanie Kreshel, Puget Sound Energy, RE: Results of the 2007 Risk Model Run. (scanned & posted) |
Letter | 09/17/2007 | Letter to Alan Rathbun from Stephanie Kreshel, Puget Sound Energy, RE: Results of the 2007 Risk Model Run. (scanned & posted) |
Order - Final | 07/17/2007 | Notice of Finality.
|
Transcript | 06/19/2007 | Transcript Vol. 8, June 5, 2007, Pages 136 - 159. (Billed 06/29/07)
|
Order - Initial | 06/18/2007 | Order 09 - Initial Order Approving Substitute Second Settlement Agreement 041624 |
Exhibit | 06/13/2007 | Exhibit List.
|
Agreement | 06/05/2007 | Substitute Second Settlement Agreement on behalf of Parties from Donald T. Trotter. |
Notice of Hearing | 05/09/2007 | Notice of Hearing on Settlement Proposal (Set for June 5, 2007, 9:30 a.m.) |
Agreement | 05/04/2007 | Second Settlement Agreement, Exhibit A and Narrative Supporting Second Settlement Agreement on behalf of Parties from Donald T. Trotter.
|
Letter | 04/11/2007 | Letter to Alan Rathbun from Duane A. Henderson, Puget Sound Energy, RE: Settlement Agreement - Wrapped Steel Service Assessment Program Electrical Survey Sampling Methodology. (scanned & posted)
|
Letter | 03/28/2007 | Letter to Alan Rathbun from Duane A. Henderson, on behalf of Puget Sound Energy, RE: Wrapped Steel Services Assessment Program Service Installation Histogram. (scanned & posted) |
Report | 03/16/2007 | Final Wrapped Steel Service Assessment Program (WSSAP) Report on behalf of Puget Sound Energy from Duane A. Henderson. (via e-mail) |
Letter | 08/11/2006 | Letter to Dave Danner from Duane A. Henderson on behalf of Puget Sound Energy, RE: Revises the estimated completion date to mid-October. (Scanned & Posted) |
Memorandum | 07/17/2006 | Memo from Alan Rathbun to Bob Wallis RE: Staff and PSE progress reports on PSE's Wrapped Steel Assessment Program. |
Letter | 07/12/2006 | Letter to Alan Rathbun from Duane Henderson of Puget Sound Energy, responding to staff's data request submitted to PSE on June 28, 2006.
|
06/28/2006 | Email from Alan Rathbun to Duane Henderson of Puget Sound Energy, requesting data on PSE Wrapped Steel Project Assessment Program.
|
|
Letter | 05/19/2006 | Letter to Alan Rathbun from Duane A. Henderson on behalf of Puget Sound Energy, RE: May 2006 Update Report for Wrapped Steel Services Assessment Program. (scanned & posted) |
05/03/2006 | E-mail from Jeanine Livingston to Carole Washburn, RE: Response regarding UTC Contract. | |
Letter | 05/02/2006 | Carole Washburn letter to Jeanine Livingston, Washington Federal of State Employees, RE: Request of WUTC to pursue a contract with an expert witness. |
Document | 03/02/2006 | Advisory Bulletin - Maintenance of Impressed Current Cathodic Protection Systems. |
Letter | 01/18/2006 | Letter on behalf of Bellevue City Hall & City Attorney's Office from Cheryl A. Zakrzewski, RE: Notice of Change of Address (via fax).
|
Exhibit | 11/07/2005 | Exhibit List as of November 7, 2005.
|
Letter | 11/01/2005 | Letter from Alan Rathbun to Duane Henderson RE: Revised Settlement Agreement. |
Order - Other | 10/19/2005 | Order No. 08 - Order Modifying Order No. 07 Approving Settlement Agreement |
Transcript | 10/12/2005 | Transcript; Volume 7; 10/12/05; pages 99-135. (Billing 10/21/05)
|
Motion | 10/12/2005 | Motion for Clarification of Commission Order No. 07 on behalf of Commission Staff from Donald T. Trotter. (Scanned & Posted) |
Order - Final | 10/07/2005 | Order No. 07 - Order Approving Settlement Agreement |
Transcript | 09/23/2005 | Transcript Volume 6, September 9, 2005, Pages 79-98. (Billing 10/7/05)
|
Agreement | 09/22/2005 | Revised Settlement Agreement and Revised Narrative on behalf of Parties from Donald T. Trotter.
|
Notice of Hearing | 09/14/2005 | Notice of Continuance of Settlement Hearing (Set for September 28, 2005, 2 - 4 p.m.) |
Brief | 09/13/2005 | Brief in Support of Settlement Agreement on behalf of Puget Sound Energy from Amanda J. Beane. |
Response | 09/08/2005 | Response to the Four Issues in the Commission's Prehearing Conference Notice on Behalf of Commission Staff from Donald T. Trotter. |
Notice of Hearing | 09/07/2005 | Notice of Prehearing Conference Addressing Settlement Hearing Procedures (Set for Friday, September 9, 2005 at 9:00 a.m.) |
Notice | 08/26/2005 | Notice Suspending Schedule of Proceedings; Notice of Hearing on Settlement (Set for Wednesday, September 14, 2005, at 3:30 p.m.) |
Agreement | 08/25/2005 | Settlement Agreement and Narrative Supporting Settlement on behalf of Parties from Donald T. Trotter. (Scanned & Posted) |
Agreement | 08/22/2005 | Agreement to Mediate on behalf of Puget Sound Energy, City of Bellevue and staff. |
Testimony | 08/13/2005 | Direct Testimony of Susan McLain, Harry Shapiro, Jim Hogan, Dennis Burke, and Kevin Garrity on behalf of Puget Sound Energy from James F. Williams.
|
Letter | 07/25/2005 | Letter to James Williams and Don Trotter from Cheryl A. Zakrzewski on behalf of the city of Bellevue, RE: City of Bellevue will not be filing testimony in this matter. (Scanned & Posted) |
Testimony | 07/21/2005 | Testimony and Exhibits of Graham E.C. Bell, Ph.D, P.E., Alan Rathbun, and Kuang-Shi Chu on behalf of staff from Donald Trotter, AAG.
|
Transcript | 07/11/2005 | Transcript Volume 5, June 24, 2005, Pages 67-78. (Billing 7/20/05)
|
07/01/2005 | E-mail from Mark Sidran to PG-041624 et al, RE: Scheduled Meeting with PSE Board. | |
Order - Prehearing Conference | 06/27/2005 | Order No. 06 - Prehearing Conference Order Modifying Schedule
|
Notice of Hearing | 06/17/2005 | Notice of Prehearing Conference (Set for June 24, 2005 at 12:30 p.m.)
|
Motion | 06/15/2005 | Motion for Prehearing Conference to Amend and/or Vacate the Case Schedule on behalf of Commission Staff from Donald T. Trotter.
|
Notice | 06/13/2005 | Notice of Substitution of Counsel of Record on behalf of City of Bellevue from Cheryl A. Zakrzewski. (Scanned & Posted) |
Confidentiality Agreement | 05/06/2005 | Confidentiality Agreement for Raleigh Purtzer on behalf of M.J. Schiff from Raleigh Purtzer. (Scanned & Posted) |
Transcript | 03/29/2005 | Transcript Volume 4, March 15, 2005, Pages 57-66. (Billing 4/11/05)
|
Order - Prehearing Conference | 03/15/2005 | Order No. 05 - Prehearing Conference Order Establishing Schedule
|
Notice of Hearing | 02/22/2005 | Notice Granting Continuance of Prehearing Conference (Set for March 15, 2005, at 9:30 a.m.) |
Letter | 01/07/2005 | Letter to Jim Hogan from Alan Rathbun, RE: Staff response to Coating Survey Protocols. |
Letter | 01/07/2005 | Letter to Jim Hogan from Alan Rathbun Re: Coating Survey Protocols. |
Transcript | 12/23/2004 | Transcript Volume 3, December 9, 2004, Pages 44-56. (Billing 1/4/05)
|
Order - Prehearing Conference | 12/09/2004 | Order No. 04 - Prehearing Conference Order - Notice of Prehearing Conference (Set for Thursday, February 24, 2005, at 9:30 a.m.)
|
Response | 11/18/2004 | Answer to Complaint on behalf of Puget Sound Energy from Amanda J. Beane. |
Transcript | 11/04/2004 | Transcript Volume 2, October 21, 2004, Pages 32-43. (Billiing 11/16/04)
|
Order - Protective | 10/28/2004 | Order No. 03 - Protective Order |
Order - Prehearing Conference | 10/28/2004 | Order No. 02 - Prehearing Conference Order; Notice of Prehearing Conference (Set for Thursday, December 9, 2004 at 9:30 a.m.)
|
Letter | 10/19/2004 | Letter to Kuang Chu from Kieron L. Gillmore, Bellevue Fire Department, RE: Copy of the Fire Incident Report & Investigator's report for BEFD Incident #04-11367. (scanned & posted) |
Letter | 10/18/2004 | Letter to Alan Rathbun from Jim Hogan, PSE, RE: Status of Bellevue House Fire. (scanned & posted) |
Petition | 09/20/2004 | Petition to Intervene and Notice of Appearance on behalf of the City of Bellevue from Lori M. Riordan. |
Order - Other | 09/17/2004 | Order No. 01 - Order Requiring Emergency Action; Notice of Prehearing Conference (Set for Thursday, October 21, 2004, at 9:30 a.m.) |
Exhibit | 09/17/2004 | Exhibit List as of September 17, 2004. |
Exhibit | 09/17/2004 | Exhibit Nos. 1 & 2 admitted. |
Transcript | 09/16/2004 | Transcript, Volume 1, September 15, 2004, Pages 1 - 30. (Billing 9/30/04)
|
Document | 09/16/2004 | Miscellaneous documentation RE: Bellevue Explosion Investigative Site. (scanned & posted) |
Document | 09/15/2004 | Agreed Submission by Puget Sound Energy and Staff of the Washington Utilities and Transportation Commission from Donald T. Trotter, AAG and James F. Williams. (Scanned & Posted) |
Notice of Hearing | 09/13/2004 | Notice of Emergency Adjudication - Notice of Hearing (Set for September 15, 2004, 3:00 p.m.)
|
Complaint | 09/13/2004 | Formal Complaint against Puget Sound Energy.
|