Summary: Revisions to WN U-60, Tariff G, creating a new interconnection tariff Schedule 152, and implementing concurrent changes for consistency in Schedule 150, net-metering and Schedule 151, renewable generation production incentives. These revisions implement the technical and administrative requirements of the Commission's amended interconnection rule, WAC 480-108, and General Order R-571.