UTC Case Docket Details

Docket Number 231031

Case Docket Details Table
Docket Number UE-231031
Advice 2023-60
Company Puget Sound Energy
DBA
Filing Type Petition
Industry (Code) Electric (140)
Status Closed
Lead Staff Nightingale, Joel (UTC)
Filed Date 12/20/2023
Effective Date 02/29/2024
Summary Petition from Puget Sound Energy proposing to remove two conditions ordered by the Commission in its approval of the Company's Schedule 150 (Net Energy Metering) tariff filing in Order 01 in this docket.

Event History

  • 09/27/2024 -- Approved (Commissioner Doumit moved that Order 01 in this docket be amended, such as the conditions contained in paragraph 29 of that order are stricken and replaced by the following three conditions: 1. PSE will file Washington State Academy of Sciences expected Interim Report (due June 30, 2025) in this docket. 2. As informed by the findings in the Washington State Academy of Sciences expected Interim Report (to be submitted with the Commission June 30, 2025), PSE must conduct a territory-specific distributional equity analysis on its net metering program (Schedule 150) and file it in this docket. PSE must complete at least the first four (4) steps, as described in Figure 1. Key Stages in Distributional Equity Analysis Framework (or Framework), from the U.S. Department of Energy’s “Distributional Equity Analysis for Energy Efficiency and Other Distributed Energy Resources: A Practical Guide” no later than December 31, 2025. 3. At a minimum, PSE will invite members of its Conservation Resources Advisory Group, Equity Advisory Group, and Low-Income Advisory Committee to be part of its “Community and Stakeholder Involvement,” as described in the Framework. Commissioner Rendahl seconded the motion. The motion carried (2:0) )
  • 09/27/2024 -- Closed
  • 09/26/2024 -- Open Meeting
  • 09/17/2024 -- Formal
  • 02/23/2024 -- Allowed (Commissioner Rendahl moved to issue an order allowing the revisions to Schedule 150 filed by Puget Sound Energy on January 18, 2024, to become effective February 29, 2024, on condition that: 1. PSE conduct a distributional equity analysis of the Schedule 150 tariff schedule using the framework developed in its distributional equity analysis pilot (as required by Condition 50 in UE-220066) and share the results of that study, and PSE’s proposed next steps in a workshop with all interested persons no later than December 31, 2024. 2. PSE invite to the above-mentioned workshop, at a minimum, members of its Conservation Resources Advisory Group, Equity Advisory Group, and Low-Income Advisory Committee. Commissioner Doumit seconded the motion. The motion carried (3:0) )
  • 02/23/2024 --
  • 02/22/2024 -- Open Meeting
  • 12/20/2023 -- Pending
  • 12/20/2023 -- Open