-
2024
-
8757 Operator Qualification Inspection Avista Utilities, Headquarters
8759 OM PPR Gas - Operations & Maintenance, Plans & Procedures Review, Headquarters
- Pending
8760 Standard Comprehensive - Gas Distribution, Pullman / Clarkston
-
2023
-
8569 Standard Comprehensive - Gas Distribution, Colville
8570 Public Awareness Program Inspection Avista Utilities, Headquarters
8571 Anti-Drug and Alcohol Misuse Inspection Avista Utilities, Headquarters
8572 Standard - Annual Review, Headquarters
8573 Records Review - Field Verification (Standard) Gas Transmission Inspection, Headquarters
8574 Gas Transmission Integrity Management Program Review
8664 Pipe Replacement Plan, Headquarters
8734 DIMP - Gas Distribution Integrity Management Inspection Avista Utilities, Headquarters
-
2022
-
8416 Standard - Annual Review, Headquarters
- 8416 Inspection Form A
- 8416 Inspection Results Letter
- 8416 Operator Response Letter
- 8416 Closure Letter
8417 Standard Comprehensive - Gas Distribution, Ritzville
8418 Standard Comprehensive - Gas Distribution, Spokane
8485 Design Testing & Construction - Ritzville
8509 Section 114, Headquarters
-
2021
-
8154 Control Room Management, Headquarters
8284 Standard Comprehensive - Gas Distribution, Pullman/Clarkston
8249 Standard - Annual Review, Headquarters
8250 Pipe Replacement Plan, Headquarters
8330 Design, Testing & Construction, Spokane
-
2020
-
8030 Standard Comprehensive - Gas Distribution, Colville
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results (IRR)
- Inspection Document: Form C Records Review and Field Verification
- Inspection Document: Form R Field Data Collection Form
- Results of Inspection Letter
8097 OM PPR Gas - Operations & Maintenance, Plans & Procedures Review, Headquarters
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results (IRR)
- Inspection Document: Form V Procedures and Plan Review Results of Inspection Letter
8034 Standard - Annual Review, Headquarters
8032 Standard Comprehensive - Gas Transmission, Transmission
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR) Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results (IRR) Inspection Document: PHMSA MIS Form 13 Inspection Document: Form D Records Review and Field Inspection Results of Inspection Letter
8031 OQ - Operator Qualification, Headquarters
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR) Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results (IRR) Results of Inspection Letter
8033 TIMP - Gas Transmission Integrity Management, Transmission
-
2019
-
7782 Public Awareness Program Inspection Avista Utilities, Headquarters
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Results of Inspection Letter
7783 Anti-Drug and Alcohol Misuse Inspection Avista Utilities, Headquarters
- Inspection Document: PHMSA Inspection Assistant (IA) Form 3.1.11
- Results of Inspection Letter
- Response from Operator
- Closure Letter
7780 Records Review - Field Verification - Gas Distribution Inspection Avista Utilities, Ritzville
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Inspection Document: Form C - Standard Inspection Checklist
- Inspection Document: PHMSA OQ Field Inspection Form
- Results of Inspection Letter
7785 Standard - Annual Review Inspection Avista Utilities, Headquarters
7779 Records Review - Field Verification - Gas Distribution Inspection Avista Utilities, Spokane
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Inspection Document: Form C - Standard Inspection Checklist
- Inspection Document: PHMSA OQ Field Inspection Form
- Results of Inspection Letter
7781 DIMP - Gas Distribution Integrity Management Inspection Avista Utilities, Headquarters
-
2018
-
7557 Records Review - Field Verification (Standard) Gas Transmission Inspection, Headquarters
- Inspection Document: Form R - Optional Field Data Collection Form
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
7558 Records Review - Field Verification (Standard) Gas Distribution Inspection, Colville
- Inspection Document: Form R - Optional Field Data Collection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Results of Inspection Letter
7560 Records Review - Field Verification (Standard) Gas Distribution Inspection, Pullman
- Inspection Document: Form R - Optional Field Data Collection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Results of Inspection Letter
-
2017
-
7251 Operations and Maintenance (O&M) Inspection, Headquarters
- Inspection Document: Form V - Intrastate Gas – Procedures and Plan Review
- Results of Inspection Letter
7259 Transmission Integrity Management (TIMP) Inspection, Headquarters
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Results Report (IRR)
- Results of Inspection Letter
- UTC Follow-up Letter
- Avista's Response Letter
7260 Specialized Inspection, Ritzville
- Result of Inspection Letter and Report
- Inspection Document: Form C Intrastate Gas Distribution - Records and Field Inspection
- Inspection Document: Form W - 1162 Public Awareness Field Audit
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Inspection Results Report (IRR)
- Avista's Response Letter
- UTC Closure Letter
- MAOP Closure Letter
7301 Team Public Awareness (PA) Inspection, Headquarters
7302 Team Operator Qualification (OQ) Inspection, Headquarters
- Results of Inspection Letter
- Inspection Document: PHMSA Inspection Assistant (IA) Inspection Output (IOR)
7303 Team Control Room Management (CRM) Inspection, Headquarters
-
2016
-
6746 Team Distribution Integrity Management Program (DIMP) Inspection, Headquarters
- Result of inspection letter
- Inspection Document: PHMSA Form 22 Gas DIMP Inspection Form (IA Equivalent)
6770 Standard Inspection, Spokane District
-
2015
-
Standard Inspection, Transmission
- UTC Result of Inspection letter
- Inspection Document: Form D Intrastate Gas Transmission - Records and Field Inspection
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
Standard Inspection, Colville
- Result of inspection letter and report
- Inspection Document: Form C Intrastate Gas Distribution - Records and Field Inspection
- Inspection Document: Form R - Optional Field Data Collection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Avista's response letter
- UTC closure letter
Standard Inspection, Pullman/Clarkston
-
2014
-
Team Control Room Management (CRM) Inspection, Headquarters
- Cover letter and report
- Inspection Document: Inspection Assistant (IA) Results and Notes Review
- Avista response letter
- UTC closure letter
Operator Qualification (OQ) Inspection, Headquarters
- Cover letter
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Form 14 Question Set (IA Equivalent)
- Inspection Document: PHMSA Form 14 OQ Inspection Form
Standard Inspection, Ritzville
- Cover letter and report
- Inspection Document: Form C Intrastate Gas Distribution - Records and Field Inspection
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Protocol
- Avista response letter
- UTC closure letter
Transmission Integrity Management (IMP)Inspection, Headquarters
-
2013
-
Standard Inspection, Spokane/Ritzville
- Cover letter
- Inspection Document: Form C Intrastate Distribution - Records and Field Inspection
- Inspection Document: Form R Optional Field Data Collection Form
- Inspection Document: PHMSA Form 13 Drug and Alcohol Inspection Form
- Inspection Document: PHMSA Form 15 OQ Field Inspection Form
- Avista response letter
- UTC closure letter
-
2012
-
Standard Inspection, Colville
- Cover letter and report
- Inspection Document: Form C Intrastate Gas Distribution-Records and Field Inspection
- Inspection Document: PHMSA Form 13 Drug & Alcohol
- Inspection Document: PHMSA Form 15 OQ Field Inspection Form
- Avista response letter
Standard Inspection, Pullman/Clarkston
- Cover letter and report
- Inspection Document: Form C Intrastate Gas Distribution-Records and Field Inspection
- Inspection Document: PHMSA Form 13 Drug & Alcohol
- Inspection Document: PHMSA Form 15 OQ Field Inspection Form
- Avista response letter
- UTC closure letter
Standard Inspection, Transmission
- Cover letter
- Inspection Document: Form D Intrastate Gas Transmission-Records and Field Inspection
- Inspection Document: PHMSA Form 15 OQ Field Inspection Form
- Inspection Document: PHMSA Form 16 Gas IMP Field Verification Form
Operations & Maintenance Manual Inspection, Headquarters
- Cover letter and report
- Inspection Document: Form V Intra Gas Procedures and Plan Review
- Avista response letter
- UTC closure letter
Team Distribution Integrity Management Program (DIMP) Inspection, Headquarters
Team Public Awareness Program Inspection, Headquarters
- Cover letter and report
- Inspection Document: PHMSA Form 21 PAP Effectiveness Form
- Inspection Document: PAP Inspection Data
- UTC email to Avista granting extension to respond by 6-20-12
- Avista response letter
- UTC closure letter
- UTC letter regarding 2013 Follow up Inspection
- UTC letter regarding 2014 Follow up Inspection
-
2011
-
Docket No: PG-110045
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Vinsel, Lex (UTC)
Filed Date: 1/4/2011
Effective Date:
Closed Date: 12/15/2011
Summary Narrative: 2011 Intrastate Standard Natural Gas Inspection - Goldendale/Stevenson. -
2010
-
Docket No: PG-100049
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Rukke, Scott (UTC)
Filed Date: 1/6/2010
Effective Date:
Closed Date: 11/23/2011
Summary Narrative: Standard intrastate inspection for natural gas pipeline - Distribution system for Spokane/Ritzville service areas.Docket No: PG-100845
Advice Company: Avista Corporation
Filing Type: Proximity Request
Industry: Gas Pipeline
Status: Closed
Lead Staff: Lykken, David (UTC)
Filed Date: 5/14/2010
Effective Date:
Closed Date: 12/30/2010
Summary Narrative: Request for commission approval to operate a natural gas pipeline at up to 500 pound per square inch gauge of pressure within 100 feet of an existing building and two outdoor playground areas within the U. S. Army Corps of Engineers' Swallows Park in Clarkston, Washington, pursuant to WAC 480-93-020. -
2009
-
Docket No: PG-090076
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Johnson, Patricia (UTC)
Filed Date: 1/12/2009
Effective Date:
Closed Date: 12/23/2009
Summary Narrative: 2009 Intrastate Standard Natural Gas Inspection - Pullman/Clarkston.Docket No: PG-090077
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Johnson, Patricia (UTC)
Filed Date: 1/12/2009
Effective Date:
Closed Date: 11/24/2009
Summary Narrative: 2009 Intrastate Standard Natural Gas Inspection - Colville. -
2008
-
Standard Inspection Goldendale/Stevenson, Docket 080107 - No Record
Incident Investigation (Follow-up to investigation docket 071739), Docket 080368 - No RecordDocket No: PG-082253
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Mayo, Sean (UTC)
Filed Date: 12/29/2008
Effective Date:
Closed Date: 2/24/2011
Summary Narrative: Investigate 12/26/08 natural gas incident at 206 North Birch Street, Odessa.
Docket No: PG-081483
Advice Company: Avista Corporation
Filing Type: Petition for Exemption
Industry: Gas Pipeline
Status: Closed
Lead Staff: Subsits, Joe (UTC)
Filed Date: 8/11/2008
Effective Date:
Closed Date: 10/30/2008
Summary Narrative: Petition for exemption of WAC 480-93-020, requesting approval to operate a natural gas pipeline up to 500 psig within 100 ft. of existing buildings.
-
2007
-
Standard Inspection Colville, Docket 070012 - No record
Standard Inspection Pullman/Clarkston, Docket 070014 - No record
Drug and Alcohol Program Inspection, Docket 070011 - No record
API 1162 Public Awareness Program Review, Docket 070034 - No record
Incident Investigation, Docket 071494 - No record
Incident Investigation, Docket 071739 - No recordDocket No: PG-070013
Advice Company: Avista Corporation
Filing Type: Staff Investigation
Industry: Gas Pipeline
Status: Closed
Lead Staff: Rukke, Scott (UTC)
Filed Date: 1/2/2007
Effective Date:
Closed Date: 10/10/2007
Summary Narrative: Intrastate 2007 Standard Natural Gas Inspection - Spokane/Ritzville.